RexcavateComing soon to Texas

Tell us about the job

About five minutes. The questions are the ones an operator would ask on a site walk, so the quote you get is firm instead of a guess. A stump pull is short; a drainage job has a few more questions.

About you

The property

Are you the owner?

The job

Getting a machine to it

A one-ton mini excavator needs about 40 inches of clearance; a three-ton needs about 48. Measure the narrowest point between the street and the dig: a gate, a side yard, the gap between the house and the fence.

The ground

Standing water there now?

What's buried and what's overhead

811 marks public utilities. These private lines are not marked, and the operator needs to know about them before the bucket goes in.

Dirt, obstacles, permits, materials

Where should the dirt go?

Drainage changes, retaining walls, septic, and pools usually need one. Small trenches, stumps, and pads usually do not.

Timing and budget

The operator files an 811 locate before digging, which takes about three business days.

Photos and video

Six to ten photos: one from the street showing the path in, one of the narrowest point with a tape measure, and a wide shot of the work area. Then a 30 to 60 second video walking from the street to the dig and around it. Keep the video under 50 MB; standard resolution is fine.